How long does a bathroom renovation take?

The phases of a typical bathroom renovation, what usually decides the schedule, and how to keep yours on track.

Bathrooms5 min read

It's the first question almost every homeowner asks, and the honest answer is: it depends on the scope. Swapping a vanity and toilet is a very different job from moving a drain and building a curbless shower. What we can do is walk you through the phases, so you know where the time goes and what you can influence.

The phases of a full bathroom renovation

  • Planning and quote: we measure, talk through layout and materials, and put the scope and price in writing.
  • Ordering materials: tile, glass, vanities and fixtures. Custom glass is usually measured only after the tile is on the walls.
  • Demolition: removing the old finishes down to the studs or subfloor where needed.
  • Rough-in: plumbing, electrical and ventilation changes, plus any framing for niches or benches.
  • Waterproofing: the step you never see and the one that matters most in a shower.
  • Tile: floors, walls and shower, then grout and sealing.
  • Finishing: vanity, toilet, fixtures, lighting, paint, trim and finally the glass.

What usually decides the schedule

Materials are the most common cause of delays. Special-order tile, custom vanities and frameless glass can each take longer to arrive than the work itself. Choosing materials before demolition starts is the single best way to keep the job moving.

Layout changes are the second factor. Keeping the toilet, tub and shower where they are is faster than relocating drains. Older homes can also hide surprises behind the walls, such as old plumbing or uneven framing, which have to be corrected before tile goes on.

How to keep your renovation on track

  • Decide on tile, fixtures and vanity before work starts.
  • Ask for a written scope and schedule, and agree on how changes will be handled.
  • Plan for a second bathroom or another arrangement while yours is out of use.
  • Keep one point of contact, so decisions don't get lost between trades.

Every project is different, so we give you a realistic timeline with your written quote, after we've seen the space.